B2B

Injection Molding Machine (BLW 328)

Features:
1) 5 point vertical double toggle mechanism
2) Dual-cylinder balance injection system
3) Multi-stage pressure & speed injection
4) Back-pressure adjustment device
5) Low-pressure mold protection
6) Multiple hydraulic ejector knock-out
7) Mechanical / electrical safety device
8) Concentrate lubrication system
9) Hydraulic proportional control
10) Mechanical leveling pad
11) Optimized composition of hydraulic and Elements of the famous brand control
12) Linder transducer devices
13) Hydraulic safety devices Optional:
1) Multiple hydraulic core pilling and inserting
2) Cylinder transducer control
3) Multiple options of computer CPU system
4) Hydraulic safety device
5) Extended nozzle
6) Robotic pincher
7) Hopper dryer
8) Auto-loader
9) Automatic plastic dehumidifier
10) Mold temperature controller
11) Water cooler
12) Mold clamps Main electronic fitting and hydraulic component of BL-D series injection molding machine:
1) Electric motor: Zhongda-China
2) Hydraulic motor: Intermot-Italy
3) Oil pump: Vickers-USA
4) Limited switch: Omron-Japan
5) Computer: Techmation-Taiwan
6) Mould adjusting hydraulic motor: Eaton-Bulgaria
7) Stroke switch: National-Japan
8) Proximity switch: Omron-Japan
9) Dial switch: Omron-Japan
10) Automatic switch: LG-Korea
11) Contactor: LG-Korea
12) Thermorelay: LG-Korea
13) Solenoid directional valve: Vickers-USA
14) Solenoid overflow valve: Northman-Taiwan
15) Three-phrase ratio valve: HNC-Taiwan
16) Manometer pressure gage: LMT-Germany
17) Airtight packing: Valqua-Japan
18) Electric sensor: Novetechnik-Germany Notes: If you have any plans requiring engineering plastic products like mould PC and PVC, don't hesitate to tell us. If we want to improve tech specifications parameter in normal conditions, we won't make any notices. If you need more information except tech parameter form, please let us know.
Business Terms
Model No0016
Product OriginChina
Brand NameBOLE
Payment TermsT/T, L/C
Supply Ability1,500 units/year
Minimum Orderone set
Delivery Lead Time3 - 4 weeks after received T/T
CertificationsISO9001
© 2001 - 2012 Chemical Sources B2B